METRO RAIL DESIGN CRITERIA SECTION 9 / SYSTEMS
DE304.09 9-15 Revision 4: 05/09/12
Metro Baseline Re-Baseline: 04/29/10
appropriate for the length of main conduit run(s). Conduit arrangement
should use main run to each general location of equipment with branch runs
continuing between junction box and each TVM/SAV location.
Dedicated 120V, 60 Hz, and 20 amp circuits shall be provided at station
power panel for each fare collection equipment item. Separate dedicated
circuits shall be provided for each TVM, each SAV and each fare gate
console, and be UPS powered to the UFS station network equipment power
supplies inside the station communications room or the cabinet. Circuits for
TVMs, SAVs, and fare gates shall be essential load. The circuit for UFS
station network equipment shall be critical load and shall be provided directly
from the communication UPS power panel, terminated at duplex outlet
adjacent UFS network equipment rack location. Each circuit shall be labeled
on the power panel. Three-conductor (Line/Neutral/Ground) circuit with
dedicated neutrals shall be provided from power panel to each equipment
(TVM, SAV, or fare gate) location. Power conductors shall be #12 AWG
minimum, XHHW-insulated, and sized per the National Electrical Code
(NEC). A six-foot wiring pigtail shall be provided at each TVM, SAV, and
fare gate console location to allow for connection of power conductors to
equipment.
Power wiring shall be kept separate of communications cabling and shall be
run continuously, without splices, from source to each TVM, SAV, and fare
gate console location including identified future locations.
5. Communications Equipment
Each station will require a station communications room or the cabinet,
within or near the station facility for fare collection equipment personnel to
install required station network equipment. The internal space requirements
to support the UFS station fare collection equipment (TVMs/SAVsfare gates)
communication system is 48” of rack space for vertical rack mounting on
standard 19” racks.. The rack space for UFS station network equipment shall
include duplex outlet on circuit dedicated to same. Station network
equipment will consist of hubs, routers, power supplies, fiber optic network
equipment, and copper/fiber cabling; and will interface to the Cable
Transmission System at same location to support data communication
between TVMs, SAVs,and fare gates and the Central Data Collection
System (CDCS) computer located on second floor of the Metro Union
Station Gateway (USG) building using Fast Ethernet (10/100 Base T)
connectivity. Two dark fiber optic strands, daisy chained at each station,
shall be provided for fare collection equipment communications path to USG
as well as space and power for future fiber optic multiplexing equipment in
the communication room or the cabinet. In addition, a minimum 2”
communication conduit connection shall be provided to local phone
company point of connection to allow local phone company circuit
termination inside the communication room or the cabinet. The
communication room or the cabinet shall also be equipped with appropriate
air conditioning to keep equipment within their specified temperature range
for performance.