METRO RAIL DESIGN CRITERIA SECTION 9 / SYSTEMS
DE304.09 9-97 Revision 4 : 05/09/12
Metro Baseline Re-Baseline: 04/29/10
D. Underplatform Duct Banks
1. General
a. The Underplatform Duct Bank will consist of the following elements:
1) Conduits from the guideway cable through to the Cable Turning
Room (CTR). (Pulling irons are required in every CTR.) One group
of conduits from each guideway to a common CTR.
2) Conduits in the platform from the CTR to both the TC & C room and
the CTR at the opposite end of the station.
2. All conduits shall be imbedded in concrete. Two conduits, one from each
guideway cable trough to the CTR and thence to the TC & C room shall be
GRS. All others may be PVC. Spacers are required for PVC duct banks at
6-1/2” inch spacing.
Duct banks extending the length of the platform shall be uninterrupted and
as straight as possible, bends shall be gradual sweeps (factory sweeps) and
shall not exceed 180 degrees of bend, for the entire length of the cable run.
3. Conduits from the guideway cable troughs to the CTR or TC & C rooms shall
be uninterrupted and as straight as possible, bends shall be gradual sweeps
(factory sweeps) and shall not exceed 180 degrees of bend, for the entire
length of this cable run.
4. Exposed cable trays shall include protective metal covers. Use of exposed
trays shall be minimized.
E. Station Conduit Routing
Subsystem Devices of the same system within a station area shall be grouped
and routed to an Area-Junction Box. From this Area-Junction Box, all wires of
that subsystem will share an adequately sized common conduit, for wire routing
to the designated Communications Interface Cabinet (CIC).
1. Conduit routing of Subsystem Devices shall be configured as to reduce the
quantities of single conduits runs from devices to a Communications
Interface Cabinet (CIC) or to the TC & C room.
2. Subsystem Devices located in close proximity to the TC & C room may be
grouped and routed directly into the TC & C room. If these conduits enter
the TC & C room from overhead, they shall be located 11'-6" above the
finished floor or 6" above the room cable tray.
3. Conduit routing shall be configured to provide the routing path with the
fewest changes of direction.
F. Radio Antenna Sleeves and Conduit (For Subway Use)